Countess of Chester Hospital
Electrical installation to clinical rooms at the hospital, brought to handover in July 2026.
View case study
The building is a new-build distribution centre with dedicated freezer and chiller areas. Bolt Group has been appointed to install the man trap and gas detection systems for those temperature-controlled areas.
Work started on site in September 2026 while the main hall was still in fit-out, with installation carried out at height alongside the other trades on the project.




Electrical installation to clinical rooms at the hospital, brought to handover in July 2026.
View case study
Cable containment installed to external plant and pipework ahead of the next stage of the project.
View case studySend tender documents, drawings and specifications to our Birkenhead office, or call to speak to a director.