Distribution Centre, Doncaster
Man trap and gas detection systems for the freezer and chiller areas of a new-build distribution centre.
View case study
The package covers the cable containment serving the external plant on the site, installed alongside the pipework and plant supports.
Containment was underway in August 2026, with the team preparing the routes for the next stage of the project.




Man trap and gas detection systems for the freezer and chiller areas of a new-build distribution centre.
View case study
Electrical installation to clinical rooms at the hospital, brought to handover in July 2026.
View case studySend tender documents, drawings and specifications to our Birkenhead office, or call to speak to a director.